Key Budapest bridge to see renovation, traffic restrictions planned
The cycle path on a major Budapest bridge will be renovated, the road signs will be refreshed and the road will be resurfaced. The works will be carried out in two phases, during which restrictions are expected.
Margaret Bridge cycle path to be renovated
According to the Budapest Transport Centre (BKK), from 8 July until 31 August, the cycle path on the northern side of the Margaret Bridge (on the side closer to Margaret Island) will be renovated.
During the reconstruction of the cycle path, which shares a common area with the pavement, the damaged surface will be removed and a new covering will be laid. In addition, pavement signs and cyclist pictograms will be repainted.
BKK wrote in the statement that during the renovation, cyclists and pedestrians can temporarily use the cycle lane in the outside traffic lane, or the pavement.
The two phases of the project, traffic restrictions on Budapest bridge
The project will be implemented in two phases: between Monday 8 July and 4 August, the works will take place on the section between the island entrance and the Buda bridgehead, and between 4 and 31 August between the Pest bridgehead and the island entrance.
According to the company, during the works, the outer lane on the Buda side will be closed to car traffic, as a temporary cycle lane and pedestrian section will be created. During this period, only one lane will be available from Pest to Buda.
This may lead to temporary major congestion on Szent István körút and on the Pozsonyi Road slip road in the direction of Margit Bridge.
Read also:
please make a donation here
Hot news
Hungary stands firm on Russian energy: FM Szijjártó defends sovereignty amid EU criticism
Wizz Air flight delayed for 18 hours: Passengers stuck in Brussels airport
Official: Minimum wage in Hungary to rise in 2025
Hop on a festive train to Vienna and Zagreb’s Christmas markets with MÁV!
Hungary launches EUR 500,000 humanitarian aid for persecuted Christians through Hungary Helps programme
PHOTOS: Magical life-sized LEGO tram revealed in Budapest – Here’s where you can see it
3 Comments
Our money is again being wasted on “green” B.S. These bicycle tracks will be used by no more than a half a dozen cyclists per hour, just like those in Ulloi ut and Szent Istvan korut. How is this good use of taxpayers’ funds?!?
Meanwhile, on both sidewalks of Petofi hid there form massive puddles of water after every rain, which don’t dry out for days and make it impossible to walk across the bridge unless you get up on the barricade boulders separating the sidewalk from the road, which is an extremely dangerous thing to do.
But yeah, let’s throw money down the drain on ideological pet projects instead. That’s what you get when you elect a globalist-socialist nonentity for mayor. Sigh…
Hemes Statue and Fountain – regi posta utca / Vaci utca – District V much loved Historic Statue & Fountain, removed – whilst they built new complex opening August, after (3) three plus long years, residents have endured in its building, especially along regi posta utca outside McDonalds – replace this Historic Fountain – a meeting place, that in summer months provided access to re-fill water bottles, cool your feet, and has always played it’s part as a MEETING place for locals and tourists.
MASSIVE list sent to the District Mayor’s Office – signed by Residents and business operators – calling for – WANTING it put back in it’s HISTORIC Rightful Place.
Failure again of this District V – Mayors Office down, just like request after request – for the RETURN of PUBLIC Seats in the front on the Marriott Hotel on the PUBLIC Land Boulevard – and replace old and battered disgraceful PUBLIC seats in Petofi ter, the regi posta utca end, and the Public Notice / transport board – these are complaints from residents and business operators DIRECTED to the Mayors Office going back (4) four plus years – that have RESULTED in NO action, and seen subjects as detailed in this commentary fall into vile, ugly items, that are a DISGRACE to District v , we the residents and the “image” to Tourists.
Dialogue which is DEMOCRACY – our taxes pay for SUCH public and tourist needs, not the Marriott Group dictating to have NO public seating in front of there Danube location.
The Hermes Statue Fountain, just removed it -that allowed the demolition and re-build on the regi posta / vaci utca of what’s near completion to-day.
Muller – moving from there present vaci utca (2) floor location to this NEW complex, already fitting out the (2) floors they will occupy of this new complex and who-ever else – “other” tenants, are going to move in there, get them to PAY or assist financially – of the Hermes Fountain – return – which would be – or could be replaced in its HISTORIC place, immediately at the Front Door of this new complex.
LISTEN – District V council to WHAT we the residents, the tax payers the businesses – WANT – and Act – perform in OUR interest(s).
Michael Steiner – the Mayor of Budapest, is a bike rider.
Thank-fully – we don’t have a Mayor of Budapest, who is a member of the “Mob” you are a fully paid up member/supporter of – Fidesz.
Fidesz, under your Demi-God continuing on DISGRACING – Embarrassing us the “Brand” proud name of Hungary, that just goes on, the over-all DECLINE of Hungary, that see’s citizens in their MILLIONS barely surviving, that are in the 3 million plus Hungarians “classified” factually classified, as living in POVERTY, through this individual Victor Mihaly. Orban – the Fidesz Government of Hungary being the cataclysmic FAILURES – that all is EXPOSED for just not Hungarians, but “all and sundry” – countries Globally, that are Governed under DEMOCRACY.
Mount Edna – lava flows, as I commentate, but the Vesuvius sooner than later that will erupt in Hungary, the “Devil in Disguise” or “Devils Advocate” – your man, all will be on HIM – being Victor Mihaly. Orban and his Fidesz Government and Party, for the DESTRUCTION of there CREATION and Doing.