Hungary’s road development project: Massive upgrades announced
The Hungarian government unexpectedly announced massive road development plans on Wednesday evening. These include projects to connect cities in the Carpathian Basin, but there is a strong emphasis on upgrading secondary roads as well.
Major road development project
As reported by Világgazdaság, an important issue of the Magyar Közlöny („Hungarian Gazette”) was published, outlining government decisions through 74 pages, including the approval of the concepts of public construction investments until 2035.
The bulk of the document focuses on railway improvements, such as the planned purchase of new trains. However, it also includes important road development initiatives, encompassing expressway upgrades and the expansion of 4-lane, two-way public roads.
The appendix to the government decision lists the following investment packages, according to Világgazdaság.
- Improvements to connect the cities of the Carpathian Basin – a total of 16 projects (four of which are concessionary) will cover nearly 610 km of controlled-access highways and 4-lane, two-way roads. Of these, about 360 km will be newly constructed, with the public-sector elements estimated to cost around HUF 2.9 trillion (roughly EUR 7.2 billion). Additionally, 160 km of secondary and local roads, worth HUF 550 billion (EUR 1.37 billion), will be developed to strengthen economic and social cohesion in border regions.
- Investments to promote the development of the network in the west-east direction within the national borders – 12 projects (three of which are concessionary) will cover approximately 850 km of controlled-access highways and 4-lane, two-way roads, with around 540 km of new infrastructure planned. The state-funded elements are expected to cost roughly HUF 3.8 trillion (EUR 9.47 billion).
- Road developments planned for Nagyvárosok Magyarországa („Hungary of the Cities”) – 25 associated projects (four of which are concessionary) will include nearly 280 km of controlled-access highways and 4-lane, two-way roads. Around 100 km will be new infrastructure, with the state-funded components estimated to cost approximately HUF 2.3 trillion (EUR 5.73 billion).
To ensure access to the highway and primary main road network within 30 minutes for all residents by 2035, the network of secondary main roads and side roads is planned to be extended and its service quality improved. The improvements would cover 1,750 km of the network, and they would also include 30 interchanges, 14 bridges, 39 bypasses, and 8 engineering stations, for a gross value of HUF 5.7 trillion (EUR 14.2 billion). Also by 2035, 140 km of road network elements are planned to be upgraded to improve road access to industrial and technological centres, for a gross value of roughly HUF 440 billion (EUR 1 billion).
Government decision on road renovations
Another significant aspect of the aforementioned concepts is renovation. Since the deterioration of main roads is faster than that of side roads due to the high traffic load, a twenty-year lifetime can generally be achieved assuming standard maintenance procedures. Based on a twenty-year renovation cycle, an average of 5%, 350 km of the 7,018-km network needs to be renewed every year. To bring the roads up to modern standards, 3,726 km will need to be upgraded over the next decade, averaging 375 km per year—far exceeding the standard renovation target.
Side roads are typically subject to lower traffic loads, so with proper maintenance, the pavement can be kept in an acceptable condition for approximately 30 years. This means that, under a 30-year renovation cycle, 3.3% of the 23,116 km network, or around 770 km, needs to be renewed annually. However, to bring these roads up to current standards, 11,193 km of the network will need to be upgraded over 10 years, requiring an average of 1,120 km per year—considerably higher than the standard target of 770 km annually.
Municipal roads present a separate issue. Investments into the local road developments managed by municipalities would be supported in the form of tenders that local authorities would be able to apply to, up to a determined limit. These calls for proposals would be launched and managed by the Minister of Public Administration and Regional Development (Tibor Navracsics), as the government member responsible for local governments.
Read also:
please make a donation here
Hot news
Serbian Deputy PM Vulin: assassination plot is being prepared against PM Orbán
Good news for guest workers: minister says Hungary needs them!
Incredible fine imposed for calling PM Orbán and his cabinet traitors
Shuttle driver confused planes at Budapest Airport: hundreds of passengers could not fly
Will the Hungarian Parliament accept a package of anti-corruption laws?
Spending only 3 days in Budapest? Here’s our detailed tour guide!