Passengers on the Győr main line should expect journey times to increase by up to an hour during the morning and late morning, with rail replacement buses, missed services and significant disruption after overhead wires were torn down between Biatorbágy and Herceghalom, halting trains on both tracks, Mávinform said on Monday morning.
Services towards Austria disrupted
According to the operator, international services and domestic InterCity trains are running only as far as Tatabánya, where they reverse towards Győr. Express replacement buses are operating between Tatabánya and Budapest-Kelenföld.
S10 suburban services have been split, running between Déli station and Biatorbágy, and between Bicske and Győr, with replacement buses covering the Biatorbágy–Bicske section. S12 services are restricted to the Tatabánya–Oroszlány route, the Hungarian news agency wrote.

Until the disruption is resolved, Budapest’s public transport operator, BKK, is accepting rail tickets on Metro Line 4. Seat reservations have also been waived on all services along the Győr main line for the duration of the disruption.
If you missed – Budapest to Split: Hungary’s popular Adriatic night train returns for summer 2026!
Further delays at Lake Balaton
Delays have also been reported on the southern shore of Lake Balaton, where a points failure between Balatonlelle felső and Balatonboglár has temporarily halted services, Mávinform said in a Facebook post on Monday.
Trains are expected to remain stationary until the fault is repaired. The same section was affected by a similar points failure on Sunday.
Have you read this one? Train derailed in Hungary while travelling below the speed limit
Our Rail network, is a “tired” out of date, old lady” – run down and through NEGLECT of the Victor Mihaly. Orban / Fidesz Government over the course of (20) twenty years in government, that was a Humiliating Disaster that grows being EXPOSED to us, the people citizens of Hungary.
They “greased there hands” and “filled there pockets” – from large Rail improvement projects inclusive of in the purchasing of new rolling stock – trains, carriages – right through the entire Rail system of Hungary.
It will CHALLENGE us to bring a system up to standards in line that reflect this age – these times – and allow for future rail development – of rail travel – the needs for passengers – being us Hungarians and for tourist.
It will COST us to CORRECT the FAILING’s of the past Orban “mob” – but we will MOVE forward and into the Future as RAIL is vital all aspects what runs is used on RAIL in Hungary – is VITAL to our FUTURE.