The opening of the Budapest–Belgrade railway for passenger services remains uncertain, as problems have emerged with the Chinese train control system installed on the line, Transport and Investment Minister Dávid Vitézy said on Wednesday.

The system has been found to include functions that operate differently from European requirements. It is not yet clear when the railway will be ready to carry passengers, Vitézy said.

Technical issues could require months of recertification

In a post on social media, Vitézy said both the Chinese supplier and the client were working to resolve the outstanding issues. He said the choice of train control system had been decided three years ago through a political rather than professional agreement.

“Recently, it emerged that the Chinese system has functions that operate differently from the requirements, mostly because the Chinese and European systems follow different logic,” the minister wrote.

If the issues are classified as safety-critical faults, the system will have to undergo certification again, a process that could take months. If they are not considered safety-critical, passenger services could begin sooner, he said.

Vitézy also addressed the issue in a Facebook video, saying that the timing of the launch could not yet be determined. He promised to share further information as soon as it becomes available.

Passenger services will only begin once the relevant authority, the independent quality assurance body and the certifier are all satisfied that the safety systems are working properly and that no faults could endanger passengers.

Earlier tests had appeared successful

At the beginning of October, Vitézy said tests simulating peak timetable capacity had been completed successfully on the Hungarian section of the line, and that the train control system had also passed its inspection. At the time, he said no railway safety risks had been identified and an official decision was expected in mid-October.

The launch has already been delayed several times. Vitézy had most recently predicted that passenger services would begin in mid-October. On 2 November, he also expressed optimism, saying he had not heard of any concern that would prevent the line from opening in the foreseeable future.

According to Világgazdaság, former construction and transport minister János Lázár had decided to involve independent quality assurance organisation TÜV in the testing, alongside MÁV and the Hungarian authorities. Vitézy said the current government was maintaining that arrangement.

The minister stressed that the current government had not chosen the model under which the project was carried out.

More funding planned for railway upgrades

Vitézy recently announced preparations for rebuilding the railway between Hatvan and Füzesabony.

The draft 2027 budget submitted by the government led by Péter Magyar allocates HUF 80 billion for railway infrastructure upgrades, up from HUF 30 billion this year. The funding is intended for major developments as well as smaller track and station renovations.